President Bola Tinubu on Thursday commissioned the 37 Kilometer Lagos Red Line Rail project.
The Red Line rail project is a 37 Kilometer North South rail route which will run from Agbado in Ogun state to Marina with 13 stations at Agbado, Iju, Agege, Ikeja, MMIA International, MMIA Domestic, Oshodi, Mushin, Yaba, Ebute meta, Iddo, Ebute Ero and Marina.
It is expected to facilitate 37 trips daily, accommodating approximately 500,000 passengers.
Unlike the electric-powered Blue Line, the Red Line will utilise a diesel-powered system known as Diesel Multiple Unit (DMU). The Blue Line opened on September 4, 2023.
The rail system is managed by the Lagos Metropolitan Area Transport Authority (LAMATA)
Initial estimates of the Red Line project, was pegged at the cost of $135 million under the Greater Lagos Urban Transportation Project.
However, Governor Babajide Sanwo-Olu, revealed that both the Blue and Red Lines combined would exceed N100 billion.
The construction of the project was handled by China Civil Engineering Construction Corporation (CCECC).